Banneker Ventures was selected to perform all infrastructure work for Phase 1B on the historic Barry Farm Site. Barry Farm was originally built by the District of Columbia Housing Authority in 1944 and encompassed 444 units on approximately 34 acres in Ward 8. The site is bounded by Firth Sterling Ave SE, Suitland Parkway, Wade Road SE and the Dept. of Homeland Security (former St. Elizabeth’s site). Banneker will carve out and pave three (3) new roads for the newly developing neighborhood. The scope includes, all site demolition earthwork, grading, wet utilities, street lights, concrete sidewalks, curbs, gutters, asphalt paving, bus stops, pavement marking, site furnishing, and street signage.